Northstar House work: east wing refresh
Sample notice · Effective 12–23 October 2026
Fictional example: Northstar Services is using this Northstar House office project to show how a localized facilities notice can explain practical changes.
At Northstar House, Level 2’s east wing is closed for a flooring refresh from Monday 12 October through Friday 23 October 2026. The main change is that the east-wing meeting rooms and corridor are unavailable during the work window. Staff based elsewhere in the building can continue using unaffected areas.
What is affected
Northstar House, Level 2 east wing · Sample project details
Unavailable for the full work window, 12–23 October. Move meetings to another available room or use an established remote meeting option.
- Do not plan an in-person meeting in E2 or E3 during these dates.
Closed while flooring work is underway. Use the signed central corridor to reach the west-side rooms.
- Allow extra time when crossing Level 2 to reach west-side rooms.
The sample schedule places noisier work on weekdays from 09:00 to 15:00. Conditions can vary as the work progresses.
- For a call during that window, choose an available room outside the east wing.
Routes and services
Use the alternatives below for this fictional Northstar House example. Follow current on-site directions if conditions differ from this notice.
E2 and E3 are unavailable from 12–23 October.
- Check room availability through your organization’s established room-booking process.
- For a remote meeting, use the meeting option already provided for your team.
The east-wing corridor is closed during the work window.
- Use the central corridor to reach west-side rooms.
- Follow posted directions at the site if the route changes.
Details by audience
The dates and location above apply to this sample notice; use the publishing team’s stated scope for a real project.