Aerial / Boom Lift Pre-Operation

ANSI A92.20 + OSHA 1926.453 daily aerial / boom lift pre-op. Failures = OOS until corrected.

14 days free, $0 today — this template is included, and everyone else in your company uses it free.

Rolled out to every employee at AutoZone (125,000), PetSmart (50,000+), A.S. Watson and Raley's (20,000) — and at larger retailers we are not permitted to name.

Built for: Construction · Telecom · Tree Care · Sign Installation

What's inside this template

Pre-Operation Visual

  • No fluid leaks under unit (critical · weight 1.0)
  • Tires / outriggers / chassis intact, no damage (weight 1.0)
  • Boom, basket, basket-leveling links intact (critical · weight 1.0)
  • Decals and load placards legible (critical · weight 1.0)
  • Battery cables tight; no corrosion (weight 1.0)

Functional Tests (Ground Controls)

  • Emergency stop functional from ground (critical · weight 1.0)
  • Ground-control override engages cleanly (critical · weight 1.0)
  • Lower / retract / swing all responsive (weight 1.0)
  • Auxiliary power lowers basket from full extension (weight 1.0)

Functional Tests (Platform Controls)

  • Platform deadman / dual-action footswitch operational (critical · weight 1.0)
  • All boom functions smooth, no drift (critical · weight 1.0)
  • Tilt / outrigger alarm sounds when out of level (weight 1.0)
  • Horn / alarms audible (weight 1.0)

PFAS & Fall Protection

  • Anchor points labeled with rated capacity (critical · weight 1.0)
  • Operator wearing PFAS attached to anchor (critical · weight 1.0)
  • Lanyard length appropriate (no free fall above platform) (weight 1.0)

Documentation

  • Operator certified per ANSI A92.24 (critical · weight 1.0)
  • Annual inspection sticker current (weight 1.0)
  • Hour meter reading recorded (weight 1.0)

Common use cases

Daily operator pre-shift
ANSI A92 compliance
Rental return inspection

Frequently asked questions

Does this work for both telescopic and articulating booms?

Yes — covers both Group A and Group B per ANSI A92.20. Some items (e.g., jib functions) only apply to articulating units.

Go deeper on the topic

Related concepts
  • A daily huddle is a brief (10–15 minute) standing meeting held at the start of a shift or workday to align the team on priorities, surface issues, and...
  • A deskless worker is any employee whose job happens without a desk, a company laptop, or a fixed workstation. They're roughly 80% of the global workforce —...
  • A frontline employee app is a phone-first application that gives hourly, field, and deskless workers access to their schedule, pay, announcements, training,...
  • A frontline worker is any employee whose job happens away from a desk — on a production floor, in a patient room, behind a store counter, in a customer's...

Ready to use this template?

Start free with Safety & Compliance — Aerial / Boom Lift Pre-Operation is included, and everyone else in your company uses it free.

Rolled out to every employee at AutoZone (125,000), PetSmart (50,000+), A.S. Watson and Raley's (20,000) — and at larger retailers we are not permitted to name.